• Families
  • Calendar
  • PowerSchool
  • Naviance
  • Directory
  • Contact
  • Staff Portal
  • Translate
    • Português
    • Español
    • 中文
    • Français

MVRHS

Martha's Vineyard Regional High School

  • About
    • Core Values
    • Administration
      • MVRHS Administration
      • Superintendent
    • Staff Directory
    • Announcements
    • Away For the Day
    • Building Project
    • Facilities
    • School Meals Program
    • Plans and Policies
    • School Committee
    • School Improvement Plan
    • Transportation
    • Contact Us
  • Academics
    • Admission Policy
    • Bell / Block Schedule
    • Capstone
    • Departments
      • Art, Design & Technology
      • Career Technical Education
      • English
      • English Language Learners
      • Mathematics
      • Performing Arts
      • Physical Education
      • Project Vine
      • Science
      • Social Studies
      • Special Education
      • World Language
    • Final Exams
    • Library
    • Program of Studies
    • Special Education
    • Work Study / Mentorships / Internships
    • Summer
  • Athletics
    • Game Schedules
    • Athletics Handbook
    • Fall Sports
      • Cheerleading
      • Cross Country
      • Field Hockey
      • Football
      • Boys Golf
      • Boys Soccer
      • Girls Soccer
      • Unified Basketball
    • Winter Sports
      • Boys Basketball
      • Girls Basketball
      • Boys Ice Hockey
      • Girls Ice Hockey
      • Indoor Track
      • Swimming
      • Wrestling
    • Spring Sports
      • Baseball
      • Girls Golf
      • Girls Lacrosse
      • Boys Lacrosse
      • Girls Tennis
      • Boys Tennis
      • Sailing
      • Softball
      • Track
      • Unified Track & Field
    • Vineyard Gear
  • Student Life
    • Attendance
    • Away For the Day
    • Google Classroom
    • Graduation
    • Grapevine
    • High School View
    • Jobs & Internships
    • Leadership
    • Clubs
    • Program of Studies
    • School Meals Program
    • Student Handbook
    • Vineyard Gear
  • Guidance
    • Community Service
    • College Planning
    • Counselor Recommendation
    • Enrolling a Student
    • Incoming Freshman & Families
    • Naviance
    • Scholarship Program
    • School Profile
    • Transcript Request Form
  • Health
    • School Meals Program
    • School Nurse
    • School Meals Program
    • Mental Health & Wellness
    • I-Care MVRHS
    • School Based Health Center Feasibility Report
    • Sports Medicine
  • Food Service
Home » Facilities Studies

Facilities Studies

Library Study Detail

In the spring of 2015, the high school commissioned studies to investigate the state of the facilities. Areas in need of repair, renovation, upgrading, and transformation are highlighted in the studies.  Tappé Architects incorporated all of these studies into a building-wide space needs study.

Mechanical, Electrical, Plumbing and Fire Protection Existing Conditions Narrative for MV Regional High School | March 2021

Space Needs Study (Tappé Architects) | October 2016

The Martha’s Vineyard High School District issued a request for proposal in April of 2015 for a designer to complete an independent Space Needs and Feasibility Study. In June of 2015 Tappe Architects was engaged to complete the study. As outlined in the RFP, the intent of this study is to examine existing conditions and programs at the current Martha’s Vineyard High School in Oak Bluffs. Based on discussions with educators and administrators, a review of educational programs and previous studies together with an understanding of the goals and expectations of the District, this study is intended to outline future improvements that could be made to the facility to enhance the delivery of educational programs at the school.

Athletics Fields Master Plan

Building Envelope Survey Report | May 2015 | Russo-Barr Associates

In May 2015, Russo-Barr performed a limited investigation of the building envelope. This investigation consisted of an exterior visual inspection of all walls, windows and doors, conducted from the ground and the roofs. Some interior visual inspections were also conducted. This report documents their findings and includes recommendations for repairs and a detailed construction cost estimate.

HVAC Systems Evaluation | June 2015 | BLW Engineers

In a June, 2015 study of the existing HVAC systems, BLW Engineers found that the majority, if not all, of the HVAC equipment in the building has exceeded its expected operational life, is in various states of disrepair and is in need of replacement. The report includes recommendations for immediate recommendations for building systems improvement, as well as long-term recommendations followed by cost estimates.

Track Investigation Summary Report | March 2015 | CHA Design/Construction

In March, 2015, CHA found that the current track re-surfacing condition has reached its end of life and recommended a full reconstruction of the track. Several features of the existing track venue are deemed inadequate from a program /operations perspective and require improvements.  The report includes a study of existing conditions, consideration of facility improvement options, and cost-estimates.

Global Learning Center Study | October 2015 | Fielding Nair Associates

In spring of 2015, Fielding Nair International studied the existing library and used their findings as well as recommendations from a library improvement committee of students, staff and community members to envision how the library should be updated to be a suite of learning spaces to better support the needs of the school. The report includes a 3D Walkthrough, a Conceptual Design, and cost-estimates.

News

“School Leaders Asked to Renovate High School to Fit 21st Century Vision.” Martha’s Vineyard Times, January 13, 2016.

“High School Leaders Begin to Grapple With Ailing Facility Needs.” Vineyard Gazette, December 1, 2015.

“MVRHS Facilities Subcommittee Proposes Short-Term HVAC Repairs.” Martha’s Vineyard Times, November 11, 2015.

“MVRHS Committee Approves $350,000 for Immediate HVAC Repairs.” Martha’s Vineyard Times, November 24, 2015.

“Replacement of High School HVAC System has $4.8 Million Price Tag.” Martha’s Vineyard Times, October 21, 2015.

MVRHS Facilities

  • Application for Use of Building & Grounds
  • Track & Fields Project
  • Facilities Studies
  • Facilities Usage
  • Performing Arts Center
  • MVRHS Building Map
  • Contact Building & Grounds Manager
  • Asbestos Hazard Emergency Response Act (AHERA) Info
100 Edgartown Road
Vineyard Haven, MA 02568
Directions

Phone: 508.693.1033
Fax: 508.696.7743

 

  • Facebook
  • X
  • Instagram
  • YouTube
  • Staff Directory
  • Contact
  • Building Map
  • Frequently Asked Questions

 

  • MVRHS School Committee
  • School Advisory Council
  • MVRHS Administration
  • Martha’s Vineyard Public Schools
  • Transportation
  • Meals Program
  • Summer Programs
  • About
  • Academics
  • Athletics
  • Student Life
  • Guidance
  • Health
  • Food Service

Copyright © 2025 Martha's Vineyard Regional High School